The project was taken in stages, with a full ‘mock up’ of the installation taking place outside Hull, to ensure a smooth transition prior to carrying out the actual installation within the Hull Flood Barrier. Work on the barrier was challenging, all products had to be lifted into place at the top of each tower, Hedley utilised a 3-Dimensional design package to ensure that the design of pipework fully integrated within the building, HPU supplier and of course the structure of the building.
John Massey, Director (Now retired) of Hedley Hydraulics said ‘the installation of the pipework and bund arrangement was a challenging project, delivering a solution, within a tight timeframe, within a multi-disciplined team was of paramount importance, we are proud of our achievements for the City of Hull and our customers’